Process Modules and Piping for a Hydrogen Plant (Helen 3H2)

Prefabrication of six complete process modules and containers (HRU, VU, GHU, HES1, HES2, and HPSC) at our workshop in Tjörn, followed by on-site installation in Helsinki of the connecting high-pressure stainless steel piping systems (up to 420 bar) using orbital welding, steel structures, and electrical and instrumentation installation.

Information

  • Type of facility Green hydrogen facility (3 MW PtX) and refueling station
  • Location Helsinki, Finland
  • Year 2025–2026
  • Client Everllence / Helen Oy