The project included the safe decommissioning and inerting of the existing facility, the relocation of cryogenic storage tanks, vaporizers, and control equipment to a new site, as well as new piping, welding, pressure testing, vacuum testing, and commissioning.
Relocation of the LNG backup system
Dismantling, relocation, modification, and reinstallation of a complete LNG backup system for the city gas network in Stockholm.
Information
- Type of facility LNG backup system for city gas networks
- Location Stockholm, Sweden
- Year 2015
- Customer Stockholm Gas


