Prefabrication of an LNG bunkering module

Factory prefabrication, assembly, and testing of complete, frame-mounted bunkering and unloading modules (skids) made of stainless steel for the transfer of liquefied natural gas and biogas (LNG/LBG).

The modules were equipped in our workshop with cryogenic control and shut-off valves, safety valves, pneumatic actuators, pressure and temperature sensors, and electrical and instrumentation cabling. Prior to delivery, non-destructive testing (NDT), leak testing, helium leak detection, and CE marking in accordance with the PED were performed.

Information

  • Type of Facility Prefabricated bunkering and control module (Bunkering Skid) for LNG/LBG
  • Location Manufactured in Kållekärr, Tjörn (for delivery to, among other places, the Port of Gothenburg and Nynäshamn)
  • Year 2017–2020